Off-Grid Power Packs
Fully independent solar for locations with no reliable WBSEDCL supply — farm huts, sheds and remote installations.
EnquireWhether you want the lowest possible bill, uninterrupted backup through load-shedding, or three-phase power for a warehouse or tube-well, the system is designed, installed and maintained by our own team in Nadia.
Typical size
1 – 10 kW
Net metering with WBSEDCL
Your roof generates through the day and exports the surplus to the WBSEDCL grid. A bi-directional meter counts what you export against what you import, and you are billed only on the difference.
Bi-directional net meter
We file the net-metering application and coordinate the WBSEDCL inspection.
PM Surya Ghar subsidy
Up to ₹78,000 credited directly to your bank account.
25-year performance warranty
DCR-compliant mono PERC panels with manufacturer backing.
Generation monitoring
Track daily output from your phone and spot problems early.
On-grid systems shut down during a power cut — this is a mandatory safety rule that protects line workers. If you need backup, see the hybrid option below.
Typical size
2 – 10 kW
Zero load-shedding, day or night
A hybrid inverter runs your home on solar, charges a battery bank with the surplus, and switches over the instant the grid fails. Your fans, lights, TV, Wi-Fi and fridge simply keep running.
Instant changeover
No flicker, no reset — sensitive electronics stay on.
Tubular or lithium bank
Tubular for value and long life; lithium for compact size and fast charging.
Sized to your load
We measure the exact appliances you want backed up, and for how many hours.
Solar-first charging
The battery charges from the sun before it ever touches grid power.
Battery choice drives both cost and lifespan. We will walk you through tubular versus lithium honestly during the survey, with real numbers for your load.
Typical size
10 – 100+ kW
Warehouses, cold storages, shallow tube-wells
Commercial tariffs are the highest in West Bengal, which makes solar pay back fastest exactly where consumption is heaviest — cold storage compressors, warehouse lighting and irrigation pumps.
Warehouses & godowns
Large clear roof spans are ideal for high-capacity arrays.
Cold storage units
Offsets the compressor load that drives your bill through the summer.
Shallow tube-wells
Solar pumps for 2 HP – 5 HP irrigation, with or without grid support.
Commercial documentation
Sanctioned-load paperwork and WBSEDCL LT/HT coordination handled.
Agricultural pump installations may qualify under separate state and central schemes. We will tell you which route gives you the better deal.
The honest trade-offs between the three routes people in Nadia usually choose between.
| Feature | On-Grid Solar Net metering Cheapest bill | Best all-round Hybrid Solar Solar + battery | Inverter + Battery Standalone, no solar Lowest upfront |
|---|---|---|---|
| Power outage backup | None Shuts down during a cut (safety rule) | Full 4 – 12 hours on essential loads | Full 3 – 6 hours, limited by battery only |
| Reduces your electricity bill | Up to 90% Exports surplus to WBSEDCL | Up to 85% Slightly lower — battery losses | No Adds 10 – 20% to your bill (charging) |
| Payback period | 3 – 5 years Fastest return of the three | 4 – 6 years Battery adds to the capital cost | Never It is a convenience, not an investment |
| Maintenance | Very low Panel cleaning; no moving parts | Low Cleaning + battery health checks | Moderate Tubular batteries need water top-up |
| Subsidy eligibility | Yes — up to ₹78,000 PM Surya Ghar, residential | Yes — on the solar part Battery is not subsidised | Not eligible No solar generation involved |
| Typical starting cost | ₹1.02 L net (3 kW) After ₹78,000 subsidy | ₹1.98 L net (3 kW) After subsidy, with battery | ₹25,000 – ₹45,000 Inverter plus one battery |
| Best suited to | Stable-supply areas Where cuts are rare and short | Frequent load-shedding Most of rural Nadia | Renters / small budgets Backup only, no bill saving |
On-Grid Solar
Net metering
Hybrid Solar
Solar + battery
Inverter + Battery
Standalone, no solar
Costs and payback periods are indicative for a typical 3 kW residential installation in Nadia and are confirmed only after a free roof survey. Subsidy amounts follow the PM Surya Ghar residential scheme.
Smaller jobs we handle across the district every week.
Fully independent solar for locations with no reliable WBSEDCL supply — farm huts, sheds and remote installations.
EnquireSupply, installation and replacement of branded inverters and tubular or lithium batteries, with free load testing and old-battery buy-back.
EnquireAnnual maintenance contracts covering panel cleaning, inverter servicing, wiring checks and generation audits.
EnquireTalk to Pradip Roy and the Battery House team — shadow analysis, subsidy paperwork and load-backup sizing, all included in your free roof survey.